The Details
The Challenge
The existing parking lot had extensive cracking, potholes, drainage issues, and surface fatigue from years of heavy traffic and weather exposure. The base had weakened in several areas, making simple patchwork ineffective and full replacement costly. The client needed a long-lasting, budget-conscious solution with minimal disruption to daily operations.
The Solution
Our team performed full-depth asphalt reclamation, pulverizing the existing asphalt and blending it with the underlying base to create a stabilized foundation. We then regraded the surface to correct drainage issues and installed a fresh asphalt overlay for a smooth, durable finish. This process recycled existing materials, reduced waste, and significantly lowered project costs compared to a full reconstruction.
Square Feet
Dollars
Day Turnaround
Amazing Result
Our Values Make A Difference
Integrity is our number one value
Fully transparent bids and quotes
Attention on jobsite from owner
Our contract is a relationship
Results
The Results Were Amazing
- Improved Pavement Strength 95%
- Improved Drainage Performance 90%
- Improved Surface Smoothness 32%
- Reduced Reconstruction Costs 40%
“
WE WERE THRILLED WITH HOW THIS PROJECT TURNED OUT. THE PARKING AREA IS NOW CLEAN, SAFE, AND DURABLE—A REAL BOOST TO OUR COMMUNITY. WE PROUDLY RECOMMEND THIS COMPANY TO OTHERS!

